Extension

Extension Fit Out

Wall and window opened up to connect the new space, then floor tiling, a shaker kitchen with oiled oak worktops and a full second fix on the shower room.

WhereFaversham
Duration6 Weeks
TypeExtension
Extension fit out in Faversham

The work

Another extension project coming together. We were brought in to remove an existing window and the lower section of wall to open up the new space. Once that was done, we left the client to board and plaster before returning for the next stage.

Back on site, we tiled the floor and dry-fitted a flat-pack kitchen with oak worktops, which we also oiled.

Installed 3 radiators in the extension

Completed second fix in the shower room

Fitted a full-length shower tray and riser kit

Installed a black thermostatic shower with screen

Fitted toilet and sink unit

All completed to the client's plans. We'll be back in a few weeks to fine-tune the design and install bespoke boxing-in, skirting, and architrave throughout.

Before

Before the work started

On site

During the work

After

The finished job

Get in Touch

Got A Project In Mind?

Tell us what you’re planning and we’ll give you a straight answer on how it’s best approached, what it’s likely to cost and when we could start.

Recent Work

More Projects

Complete bathroom renovation in FavershamBathroom

Bathroom

Complete Bathroom Renovation

A full strip out back to the joists, with a doorway moved, new pipework throughout and a freestanding bath set against blue scallop feature tiling.

WhereFaversham
Duration3 Weeks
TypeBathroom Renovation
View Project
Quadrant shower replacement in FavershamBathroom

Bathroom

Quadrant Shower Replacement

A leaking quadrant shower stripped right back, with a false wall to hide the pipework, the area waterproofed and tiled, and a new 900mm cubicle fitted on a raised tray.

WhereFaversham
Duration—
TypeShower Replacement
View Project